That doesn’t gel with my experience. Projects have time and budget constraints, and systems have multiple lifetimes of knowledge and practices that are poorly encoded. One only has to look at ERP failures to ask what kind of system analyst is required to solve this issue and it is very hard to hire. Eg how would you know this SKU comes in packs of 50 that has particular dimensional requirements, how would better analysts save Nike from their factory optimisation dilemma? How would a team estimate the effort involved with opening a port on the firewall? Agile has a fixed budget flexible scope.
reply