We solved separate compilation a few decades ago. So if those dependencies are causing your compile times to spiral out of control, then something is wrong.
For example unlearning separate compilation, as we seem to have done.
Right, and this also assumes "correct" isn't a moving target. Many business processes evolve over time so what was once invariant is now variable and assumptions that were always true (or false) are now occasionally not.
If people from three different business units were looking at the same system would they all agree on what "correct" is?
I have experience with multiple companies with over $100 Million/year in revenue where different departments have different definitions of what counts as a sale. So to report sales numbers you have to figure out which department is providing the numbers and which department is the audience and recalculate the figures.
The sales team wants to count a sale as any signed commitment to purchase so they can get their bonus, the finance team might only want to count what has been paid for and the warehouse might only care about shipments. There's no amount of formal verification that can overcome these kinds of politics of a business.
Even the same teams will have moving targets of correct.
I've encountered tickets where a team reports some internal tool as not functioning correctly, despite that tool having been in use for years (I've seen 20+ years) without complaint. You dig deeper and it's just that somebody thinking that is the correct outcome, and that those people who decided on had no idea what they were doing.
Now, after the LLMs made formalisation thus correctness 'cheap' I can affirm:
LLMs—with the right guardrails and tools—can safely automate the design, implementation, and verification of production-ready software. What’s left for humans is to understand the problem and steer the machine toward a solution. This is production-ready software development at the speed of thought.
1) On Formal Methods Thinking in Computer Science Education to understand the different levels of formal methods practice available. Here is a previous comment of mine which explains and links to the paper - https://news.ycombinator.com/item?id=46298961
2) Formal Methods, Informally: How to Write Programs That Work by Carroll Morgan teaches you how to reason in a formal methods manner before you start using the heavyweight tools. Much can be profitably achieved by just learning to think in this manner - https://www.cambridge.org/highereducation/books/formal-metho...
My (limited) experience from a long time ago: a course on formal specification in Z, after doing various kinds of formal proofs of correctness for both imperative and functional programs in undergraduate classes.
My observation was that in real life, you always start with an informal idea of what the program should do.
And you always have to figure out whether whatever formalization you choose matches that informal idea. And there's a rub:
“One can’t proceed from the informal to the formal by formal means.”
— Alan Perlis
I invariably found that matching to be significantly harder with the Z specification than with an actual program.
And since that is (usually) the hard step, making that step harder is a losing proposition even if it makes other steps easier. Which it might or might not.
Of course, the parameters and weights in this chain can vary, and vary sufficiently that you get a different outcome.
However, I think this fundamental and at best difficult-, at worst impossible-to-solve problem is why specification and proof are not used much.
By trying to formalize a rough idea of what the correct behavior is, encountering edge cases and deciding what is correct in each case, thus refining the idea of what is correct.
> Instead of it saying "calling the New Jersey police department" which is halfway across the continent
Yeah, that's Apple's generally broken maps search. It regularly and consistently just brings up the wildest things from the farthest reaches of the Universe (well, usually restricted to Planet Earth, barely), when I am clearly looking for something local.
I remember meetings with our M$ management when I was at Wunderlist (after the acquisition) singing the praises of Cortana and "smart inboxes".
The disconnect was almost comical. All the engineers and other regular employees had "eeew, get it away from me" on their faces, and the sentiment was "how much do I have to pay to not get this?"
The managers, on the other hand...I don't know how to describe it. What they exuded was something along the lines of a religious or probably more accurately cultish experience. They had been on the mountain, they had seen the light, the future had spoken to them, and they were preaching the gospel.
And it didn't seem like they were faking it, either.
– "Xina", alternative to Adjust.com or Kochava or AppsFlyer, written in Rust
– "Pantheon", inference platform/VMs to run Al models on GPUs
- "Minerva", AI-based user lifetime value estimates
– "Juno", payment management
– "Galf", access control
– "Matrix", UX patterns
– "Pico", data ingestion (user analytics)
– "Lumen", data transformation
– "Abacus", data computation
– "Janus", experimentation toolkit
– "Orion", experimentation toolkit
– "Role Model", AI hiring
– "Crystal", market intelligence (helps find targets to acquire)
Nuclear costs $16B/GW. Solar $1B/GW nominal. Batteries $1B for 1GW/4GWh. Figure out how much solar overcapacity and batteries you can get, within a year or two, for the price of a nuclear reactor deployable 10-20 years from now.
Interesting claims. Where are you getting those numbers?
And do you actually believe they are comparable?
German nuclear plants were producing for less than 2 cents/ kWh. Firm, day + night, summer + winter, profitable.
Intermittent renewables cost multiples of that and require massive subsidies on top and are allowed to place the burden of their intermittency on the firm producers on top of that.
So you claim as representative, not the average and not the median of nuclear power plants.
But the most expensive nuclear power plants ever produced.
Even without knowing any details about those plants, that's either statistical illiteracy or malpractice. Take your pick.
And it doesn't get better when you know the details:
- The ones you picked were all First of a Kind build (FOAK). So prototypes. It is well-documented that FOAK builds typically are 50% more expensive and longer to build than serialized builds (Nth of a Kind, NOAK). These were more around 100% longer than NOAK, for a bunch of reasons.
- A number of these were the EPR. The EPR has since been discontinued, because the manufacturer found it too hard to build. It has been replaced by the highly simplified EPR2. How is a discontinued reactor type representative of future builds?
- All of these builds were in countries that had a long hiatus in nuclear construction, so had to build up experience in the workforce, supply chain and regulators, so FOAK on steroids. Even the most experienced, France, had a gap of 18 years between the start of the previous build and the start of FV3.
- All of these builds had regulatory changes during the construction process. Sometimes massive changes, for example over 4000 changes for HPC in the UK. And not trivial things: the concrete of the outer protective shell had to be increased by 40% or something. Which has knock-on effects, because now things inside don't quite fit any longer. etc.
- New construction techniques such as modularization, factory production etc. all decrease the cost of serialized builds, but vastly increase the risk during First of a Kind builds.
And of course you are comparing installed capacity, which is an almost completely irrelevant metric. In the UK, capacity factors for solar are between 9-12%. So you have to multiply your solar numbers by 10 just to get equivalent output on average. Except average is not good enough. There is winter, there is night, there are clouds. 4h of battery are not going to get you through winter.
And you "forgot" that nuclear power plants last much, much longer than solar installations, at least twice as long, more likely 3 times and possibly 4 times. All of the plants in the US that have applied have been approved for 80 years of operations, they are now looking at 100 years and see no significant problems.
So without even taking into account new developments, you have to divide the nuclear numbers you gave by 2 and multiply the numbers for PV you gave by at least 20-80 (and that's not covering winter yet).
So $8B/GW vs. $20-80B/GW without any firming.
And which is why the price for installed capacity is not the right metric at all.
The cost of a kWh delivered reliably 24/7 is the right metric. And there nuclear shines.
And intermittents are simply not up to the job. Which is why pretty much the entire world is giving up on the fantasy of supplying an advanced industrial society using only intermittent renewables. And even the most hard-core anti-nuclear greens are coming around, as TFA reports.
As I wrote: Germany's nuclear power plants delivered reliable electricity at below 2 cents per kWh.
If you can point me to an NOAK-build that was built with an experienced workforce and robust supply chain.
Otherwise, you are just making the circular argument that because we haven't built we shouldn't build. That makes no sense.
And yes, nuclear for all capacity makes a lot more sense than intermittent renewables for all capacity. But a more balanced mix tends to work out better.
> How many hundreds of billions in subsidies and decades wasted until we reach "NOAK with an experienced workforce and robust supply chain"
None. Nuclear is cheap and quick and investments in nuclear not wasted.
We have wasted decades going down the wrong path. As an example, Germany has spent almost 25 years on the failed "Energiewende" and we haven't even completed the easy half. Nuclear did not require subsidies. Intermitten renewables anywhere from €30-50 billion just in subsidies. Per year.
France converted its electricity grid to nuclear in 15 years. For a total of €228 billion in 2011 money. Not "per year", not "subsidies". But total investment.
This does not seem at all grounded in reality? Just all around misinfomration.
The existing French nuclear fleet was built with enormous state support. Germany pays €18B in EEG support. And that is decreasing as old extremely expensive renewables are leaving the problem.
What you are doing is crying about late 2000s and early 2010s renewables being expensive. Let me ask you, what relevance does that have in 2026? We don't pay those prices today.
The reality in 2026 is the outcome of Flamanville 3, Vogtle, Hinkley point C. Then we have modern projects, and proposed subsidies like:
- Darlington SMR: Close to Vogtle
- Polish AP1000: Vogtle like
- Czech APR1000: A step below Vogtle.
- French EPR2 fleet: Absolutely insane at €100 per MWh and interest free loans alreay assuming large learning effects.
And that is before the usual timeline and budget overruns for new nuclear has happened.
Given this reply it seems like you are straying farther reality since the prospect of new nuclear is crumbling. You're not even presenting a logically sound argument. Its just victim complex and dreaming about times past.
The question to answer still remains: Poland. €100 billion. 2026. What cuts the most cumulative CO2, fastest?
A government press release, a financing conference, an academic abstract and a WEF panel. None of those links demonstrates that new nuclear is cheap or quick.
If new nuclear was cheap and quick, why are the recently proposed western subsidies tens of billions per reactor? This just doesn't add you. You realize that right?
Your own financing conference link acknowledges construction costs in the tens of billions, timelines exceeding a decade and unresolved financing.
The DOE fact sheet lists billions in government support. Does that sound cheap and quick to build?
All the links you've presented looks like an industry despereately public handouts from tax money.
But this is not surprising. The nuclear industry doesn't deliver new projects, it currently has product market fit living on tax money handouts. Presenting PowerPoints they hope to never have to flesh out the details on, since that would requrie them to admit to the costs. Just like mPower and NuScale were forced to do. The now shunned previous golden boys.
The question remains unanswered:
Poland. €100 billion. 2026. What cuts the most cumulative CO2, fastest?
> If new nuclear was cheap and quick, why are the recently proposed western subsidies tens of billions per reactor?
They aren't, and some guarantees are necessary, because VEE subsidies have dramatically distorted the markets. Even the cheapest producer cannot compete with subsidized overproduction that drives prices to zero or negative, with the government picking up the decidedly non-zero cost for just those producers that are causing the problem.
And you are projecting the reality of VEE subsidies onto nuclear.
I asked Google AI if subsidies for intermittent renewables in Germany will fall:
Total volatile renewable energy (VRE) subsidies in Germany are projected to rise significantly in the short-to-medium term (peaking around 2029 at over €22 billion), driven by falling wholesale electricity prices and legacy contract obligations.
In the long term, direct generation subsidies are legally structured to fall as older contracts expire, but the total public financial burden will likely remain high or shift into different mechanisms—such as grid infrastructure funding, battery storage incentives, and backup power plant strategies—to keep the structurally unprofitable intermittent energy system viable.
Renewable subsidies are being phased out all over the world. They aren't needed anymore.
And now you've shifted the goalposts again. First, nuclear was supposedly cheap and quick. Now it needs enormous government guarantees because renewables have somehow "distorted" the market.
So which way is it? Is new nuclear cheap and competitive, or does it need taxpayers to absorb its financial risks?
You can't have it both ways.
Why should we waste our limited resources on ruinously expensive new nuclear that won't deliver meaningful decarbonization?
The question remains unanswered:
Poland. €100 billion. 2026. What cuts the most cumulative CO2, fastest?
The estimate for six French EPR2s rose from €51.7 billion to €67.4 billion between 2022 and 2023. EDF’s later estimate is €72.8 billion, about 41% above the 2022 figure, before the reactors have been built.
I’d bet you the cost will be $140B when it’s all said and done, but this website won’t be around in 2044 (assuming no delays, good luck with that). You can bet regulations won’t stop changing over the span of decades either.
I’d rather have 70GW of solar and batteries deployed in a few years, and replace them with even cheaper ones in a number of decades.
For 6 EPR. Each EPR has 1.67 GWe. So 10.02 GW for €72.8 billion or €7.2 billion per GWe. Less than what I wrote. Versus €20-80 billion/GW for solar without firming.
Not sure why you're restricting yourself to only solar and batteries in northern european climate.
We also have, wind, firming and you know. Relying on fossil fuels for the once a decade emergency.
There's no point having the grid be an ideological purity test when we still have agriculture, aviation, shipping, construction, chemicals, heavy industry and so on to decarbonize.
System studies from Australia to Denmark are converging on finding that new nuclear makes the system vastly more expensive. Even when assuming your "NOAK" costs. Because no one would be stupid enough to build new nuclear at Vogtle or Flamanville prices.
Because the problem for nuclear is that it never solved dispatchability. It always relied on fossil fuels to solve the hard times.
You raise the floor, but that's quite meaningless when the hard times are far far above the yearly baseload requirement. Even when factoring in scheduling maintenance around it. And theen adding that your nuclear fleet may be like the Swedish or French one and have half the capacity offline when it is needed.
The person you are responding to is famous on the r/climateshitposting subreddit for making a post per day to take cheap potshots at "nukecels" and responding to every single comment. It's either a bot or someone who doesn't have a job and is extremely vested against nuclear. I'd rather you not engage with them because they (this account and its alt-accounts ?) are relentless and I want you to keep your sanity
Given that you've carved out the "realistic" exception for yourself I now presume you will keep shifting goalposts. But I digress.
System costs have been the central argument against renewables ever since they became competitive on LCOE. Which is why energy-system researchers have spent years developing, validating, and publishing models that account for hourly balancing, storage, transmission, flexibility, and sector coupling.
From Denmark to Australia system cost studies find renewable energy systems vastly cheaper than if involving new nuclear. Even when sensitivity testing very low nuclear costs.
The problem with nuclear is that it still needs the same firming to match an actual grid load. It still needs storage and gas turbines.
A smaller quantity than for renewable grids sure. But given how expensive new nuclear is it doesn't matter in the end.
Your final comment conflates dispatchability with operational flexibility.
Nuclear output is controllable, and French reactors load follow. Although using a fleet controlling which reactor takes which day, and managing their fueling cycle so they can do it.
Conventional nuclear plants are economically optimized for high utilization, cannot start from shutdown on short notice, and don't eliminate the need for capacity that can respond to sudden shortages, demand peaks, and unexpected outages.
There is a significant difference between supplying dependable energy throughout the year and economically covering the relatively few hours when residual demand becomes exceptionally high.
I am not going to follow you Gish gallop and debunk every single "study" that uses the same old wrong assumptions to make nuclear look bad.
As an example, the Australian CSIRO "study" you cite is deeply flawed.
1. Incorrect lifetime assumptions
It assumes nuclear power plants only last 30-35 years. In reality they last 80-100 years. So they are actually 3x cheaper than reported. Same trick as used in the infamous Fraunhofer ISE "study"
2. Incorrect assumptions about sunk costs
The report incorrectly treats already spent capital costs (on renewable infrastructure) as "free".
3. Underestimation of system costs
The report incorrectly averages metrics over longer time periods and thus vastly underestimates the costs of intermittency.
4. Incorrect capacity factors for nuclear.
Capacity factors between 50-80% are assumed. In reality even the world-wide average is over 80% and well-run fleets like in the US are over 90%. Again, same shady trick used in the infamous Fraunhofer ISE "study"
So same-old same-old. And as I said before: not going to debunk every single instance of always-the-same disinformation.
Denmark is now looking at nuclear, because the renewables-only strategy has failed.
Yep, and renewables + batteries are only getting cheaper. Nuclear takes a long time to build. A new plant planned today will be obsolete before construction ends.
Nuclear fans on HN don’t get that nuclear was the answer in the 90s, but is not today.
The problems in the U.K. specifically are more about grid capacity (both long distance and local substation level) and nonsense regulations (why can’t I have pluggable battery to go with my pluggable solar) than in generation.
Citation needed. For example Flamanville 3 (France) was estimated to cost around €3.3 billion, costs ballooned to over €13-19 billion. There are other similar examples such as Hinkley Point C (UK). Also maintenance is much more expensive and don't forget the cost for storing nuclear waste + decomissioning. Compare that to renewables...
Well actually given the free fall in prices of renewables and batteries, not really.
Nuclear costs $16B/GW. Solar $1B/GW nominal. Batteries $1B for 1GW/4GWh.
Figure out how much solar overcapacity and batteries you can get, within a year or two, for the price of a nuclear reactor deployable 10-20 years from now.
Not the 4 ton lunar lander of the Apollo era.