Currently, I'm running an internal experiment.
1. I have a side project. 2. I want to give the full control; CC is the so-called CEO, and I'm the so-called president of the board.
The cost of an error is marginal. I would like to see how this will end. The test is in progress.
Currently, I'm running an internal experiment.
1. I have a side project. 2. I want to give the full control; CC is the so-called CEO, and I'm the so-called president of the board.
The cost of an error is marginal. I would like to see how this will end. The test is in progress.